General info:
Basic shot info:
Advanced shot info:
Exif-related info:
  10x12 shed Jalbum »  Viewing 9-15-07 029small [Image 15 of 24]  
First slide Previous slide      No EXIF Info Index Page Start/Stop the slide show      Next slide Last slide
Comment: The ridge cap attaches to the tops of each rib, so there is a substantial air gap between the ridge and the wide/flat portion of the roof panels. During installation of the OSB roof sheathing, we left a 2" wide opening at the peak of the roofto allow hot air to rise and escape. It will pass thru these openings in the metal roofing system, but we want to keep rain, snow, and insects out. The black material in the pic is a fiber material that allows air flow but no water/snow/bug flow.
9-2-07 008small * Let the framing begin!  All the framing members have been cut to length in the garage at home.  Like the landscape timbers,
they were all labeled and loaded onto the trailer.  Of course there was a couple of

9-5-07 012small * The roof framing is pre-fab trusses, 6/12 slope.  The fascia is 2 x 4.  The window is installed with a pc of rubber water    barrier that will be trimmed to correct length when the vinyl siding is installed.  It's purpose is to direct rain that is   driven past the vinyl  siding and runs down along the tyvek covering.  The rubber sheet will be cut to overlap the top of thevinyl siding pc that runs just below it, channeling the infiltrating water thru the weep holes in the siding and back to the outside surface. * 640 x 480 * (79KB)

9-5-07 018small * The roof sheathing is 1/2

9-9-07 006small * 30 lb. roofing felt is installed with button-cap nails. * 640 x 480 * (67KB)

9-15-07 018small * We used the same roofing system that we used on the dock deck.  It is 16

Click for the original image
9-23-07 015small * The doors are installed and trimmed.  We have uses all plastic trim whenever possible (low maintenance).  Where the plastic
brick moulding meets the typar housewrap, we squeeze in a continuous bead of polyurethane caulk.  The result is a water tight
shell, awaiting installation of the front-line weather barrier; vinyl siding. * 640 x 480 * (67KB)

10-6-07 001smallcrop * We coat the floor with epoxy paint and add the cute little color chips...whatever. * 640 x 446 * (39KB)

10-6-07 013small * It's soffit time!  Each of the four corners have to be framed in to create a smooth transition and look for the soffits as
they wrap around the structure.  All the soffit material is vinyl, also. * 640 x 480 * (56KB)

10-14-07-005small * The resulting soffit installation and transition to the gable looks pretty good. * 640 x 480 * (52KB)

10-14-07-022small * All the siding trim and starter strips (metal strips along the bottoms of the walls) are installed.  After this, it's pretty
much all vinyl siding from here on out. * 640 x 480 * (62KB)

 
9-15-07 029small.JPG - 640 x 480 - (61KB)
Download file
10/28/07 7:00 AM
BluPlusPlus skin for JAlbum 4.4 created by Armond Avanes
Album last updated on 10/28/07 3:16 PM