General info:
Basic shot info:
Advanced shot info:
Exif-related info:
  10x12 shed Jalbum »  Viewing 9-23-07 015small [Image 16 of 24]  
First slide Previous slide      No EXIF Info Index Page Start/Stop the slide show      Next slide Last slide
Comment: The doors are installed and trimmed. We have uses all plastic trim whenever possible (low maintenance). Where the plastic brick moulding meets the typar housewrap, we squeeze in a continuous bead of polyurethane caulk. The result is a water tight shell, awaiting installation of the front-line weather barrier; vinyl siding.
9-5-07 012small * The roof framing is pre-fab trusses, 6/12 slope.  The fascia is 2 x 4.  The window is installed with a pc of rubber water    barrier that will be trimmed to correct length when the vinyl siding is installed.  It's purpose is to direct rain that is   driven past the vinyl  siding and runs down along the tyvek covering.  The rubber sheet will be cut to overlap the top of thevinyl siding pc that runs just below it, channeling the infiltrating water thru the weep holes in the siding and back to the outside surface. * 640 x 480 * (79KB)

9-5-07 018small * The roof sheathing is 1/2

9-9-07 006small * 30 lb. roofing felt is installed with button-cap nails. * 640 x 480 * (67KB)

9-15-07 018small * We used the same roofing system that we used on the dock deck.  It is 16

9-15-07 029small * The ridge cap attaches to the tops of each rib, so there is a substantial air gap between the ridge and the wide/flat 
portion of the roof panels.  During installation of the OSB roof sheathing, we left a 2

Click for the original image
10-6-07 001smallcrop * We coat the floor with epoxy paint and add the cute little color chips...whatever. * 640 x 446 * (39KB)

10-6-07 013small * It's soffit time!  Each of the four corners have to be framed in to create a smooth transition and look for the soffits as
they wrap around the structure.  All the soffit material is vinyl, also. * 640 x 480 * (56KB)

10-14-07-005small * The resulting soffit installation and transition to the gable looks pretty good. * 640 x 480 * (52KB)

10-14-07-022small * All the siding trim and starter strips (metal strips along the bottoms of the walls) are installed.  After this, it's pretty
much all vinyl siding from here on out. * 640 x 480 * (62KB)

10-20-07 005small * This is a pretty good pic to exhibit what we did with the window.  This is going to be an exterior electrical box with a 
weather-tight duplex receptacle.  If any rain is driven behind the siding at this trim box (and yes, it will happen), it will
run down to the rear of the siding at the overlap ledge, find the weep holes that are factory-molded into all the edges of 
all the siding overlaps, and exit to the outside. * 640 x 480 * (34KB)

 
9-23-07 015small.JPG - 640 x 480 - (67KB)
Download file
10/28/07 7:01 AM
BluPlusPlus skin for JAlbum 4.4 created by Armond Avanes
Album last updated on 10/28/07 3:16 PM