  10x12 shed Jalbum »  Viewing 9-9-07 006small [Image 13 of 24]  
First slide Previous slide      No EXIF Info Index Page Start/Stop the slide show      Next slide Last slide
Comment: 30 lb. roofing felt is installed with button-cap nails.
8-18-07 055small * This is a pretty good view of the grade that we are working with.  The entire landscape slopes down from right/frame to 
left/frame.  This makes sense since it is heading to the pond off to the left about another 100 feet.  The trenches we cut
into the center of the walkway to house the perforated drainpipe are pretty low at the exit end.  It works good, though, 
because the are between the pipes that is dirt in the photo is at the overhead door and will be completely filled in with
river rock.  The entire drainage system will be covered with rock. * 640 x 480 * (76KB)

8-18-07 061small * The soil we excavated out of the slab area is worked back to fill in behind the landscape timbers.  We dress and slope it so rain water will run down to the outside of the timbers (but not over them) and drain away in either direction. * 640 x 480 * (70KB)

9-2-07 008small * Let the framing begin!  All the framing members have been cut to length in the garage at home.  Like the landscape timbers,
they were all labeled and loaded onto the trailer.  Of course there was a couple of

9-5-07 012small * The roof framing is pre-fab trusses, 6/12 slope.  The fascia is 2 x 4.  The window is installed with a pc of rubber water    barrier that will be trimmed to correct length when the vinyl siding is installed.  It's purpose is to direct rain that is   driven past the vinyl  siding and runs down along the tyvek covering.  The rubber sheet will be cut to overlap the top of thevinyl siding pc that runs just below it, channeling the infiltrating water thru the weep holes in the siding and back to the outside surface. * 640 x 480 * (79KB)

9-5-07 018small * The roof sheathing is 1/2

Click for the original image
9-15-07 018small * We used the same roofing system that we used on the dock deck.  It is 16

9-15-07 029small * The ridge cap attaches to the tops of each rib, so there is a substantial air gap between the ridge and the wide/flat 
portion of the roof panels.  During installation of the OSB roof sheathing, we left a 2

9-23-07 015small * The doors are installed and trimmed.  We have uses all plastic trim whenever possible (low maintenance).  Where the plastic
brick moulding meets the typar housewrap, we squeeze in a continuous bead of polyurethane caulk.  The result is a water tight
shell, awaiting installation of the front-line weather barrier; vinyl siding. * 640 x 480 * (67KB)

10-6-07 001smallcrop * We coat the floor with epoxy paint and add the cute little color chips...whatever. * 640 x 446 * (39KB)

10-6-07 013small * It's soffit time!  Each of the four corners have to be framed in to create a smooth transition and look for the soffits as
they wrap around the structure.  All the soffit material is vinyl, also. * 640 x 480 * (56KB)

 