General info:
Basic shot info:
Advanced shot info:
Exif-related info:
  Liberty Web Docks-Launch Jalbum input »  Viewing Libertylaunchdock011012stitchsmall [Image 29 of 39]  
First slide Previous slide      No EXIF Info Index Page Start/Stop the slide show      Next slide Last slide
Comment: ...looking across to the building site beyond
Libertylaunch&dockday8 005small * The main deck supports are 2

Libertylaunch&dockday8 019small * The floor joists will be 2

Launch-dockday9-042small * All the dock stringers and deck floor joists are installed.  The main roof support framing is
also complete.  The second launch pour is complete, creating a 12' x 62' launch.  The entire 
dock and deck is 42' long.  Donna is either dreaming of the day when we can sit out here and 
watch the sunset...or...how much more work I want to get done yet today.  This is a Gatorade 
moment. * 640 x 480 * (204KB)

Libertylaunch&dockday9 030small * The blocking is installed between the floor joists.  The deck framing turned out great.  We are
both very pleased....and exhausted. * 640 x 480 * (201KB)

Libertylaunch&dockday9 004small * Finally, we get a few rain-free days in a row and complete the second launch slab pour.  Like the craftsman that I am, I 
carefully apply the delicate finished surface that we seek. * 640 x 480 * (197KB)

Click for the original image
Libertylaunch&dockday9 022small * I spent $15 on a cheap pneumatic impact driver and brought the compressor to the jobsite.  I
don't always make good decisions, but this one goes over the top.  No more spinning a wratchet 
for this guy. * 640 x 480 * (164KB)

11-21-06 018small * The final, framed product, ready for decking and a roof.  Oh yeah, and some approach steps.  
Spring of 2007 will be busy.  Bring on da juice! * 640 x 480 * (206KB)

11-21-06 019small * We had issues with the stability of our original design.  A roof is going to create a pretty big
kite when the wind really starts honkin', so the decision is made to reinforce the entire 
framework with structural diagonal bracing.  6


5-31-07012,013stitchmedium * Please excuse the stupid blue tarp, but the sun protection it provides far outweighs the discomfort of the heat as we toiled
with the decking installation.  It's the end of May '07 and the last deck board has just been installed.  It was alot of 
work, but no regrets.  Even now the view is wonderful.  We are anxious for thelast 2-1/2 feet of water depth to accummulate
and fill in. * 700 x 309 * (35KB)

 
Libertylaunchdock011012stitchsmall.JPG - 640 x 293 - (106KB)
Download file
1/1/07 3:23 PM
BluPlusPlus skin for JAlbum 4.4 created by Armond Avanes
Album last updated on 3/16/08 9:18 AM