Docks and launch Jalbum input »  Viewing launchanddock014     [Image 13 of 38]  :: Jump To  
             
Comment: Continuous, multiple slab pours are typically separated at the smooth dowel seams with expansionjoint. I conferred with a trusted friend and concrete contractor and he dismissed expansion joint as unnecessary for such a low-tech, underwater application. He did, though, insist on doweling the slabs together. Our striker board sits atop the first slab, awaiting the call to action.





 
launchanddock014.JPG - 640 x 480 - (230KB)





Album last updated on 3/28/17 8:18 PM
Powered by jAlbum and BluPlusPlus skin