Image activities
Back to index page
Next image
Previous image
Information
12-23-06040small.JPG
JPEG
Resolution: 640×480
File size: 31256 bytes
Date: 12/24/06 4:39 PM
Powered by JAlbum JAlbum
12-23-06040small.JPG (7 of 30)

DECEMBER 23, 2006 We are standing on the dam, looking back to the building site. The entire bottom is now covered. As much as this is a milestone, it is only a beginning. As the water fills, the shoreline will continue to push to the left, up into the timber. We are about 7 feet deep in the basin directly in front of us. There is about another 7 feet of depth to go. It is this last 7 feet that will be the bulk of the water needed to really fill 'er up.