Image activities
Back to index page
Next image
Previous image
Information
Phase2ponddone 005small.JPG
JPEG
Resolution: 640×480
File size: 48823 bytes
Date: 1/14/07 11:18 AM
Powered by JAlbum JAlbum
Phase2ponddone 005small.JPG (10 of 30)

JULY 25, 2006 The drain has been closed for about a week. Let the fill-up begin. We are standing on the south end of the dam, looking across the wide, flat basin in front of it. The sand beach is at the other side. An interesting reference for depth will be the black pipe in the basin below. It is the drain filter case and stands about 6 feet tall from the bottom.