Comment: Still in the dam site area, we are on the south side and just east of the dam site (on the waterside of the dam). Left of frame is the pond-water side of the hill that the dam will tie into. We are looking up into the west draw. The original plan was to allow water to creep up into this draw and leave it natural with the existing trees. The new plan is to fill it with waste soil to create a knoll and tie it into the continuous drive that will go around most of the pond. This same drive will go right across the top of the dam. A culvert will be used at the base of the draw to allow uninterrupted flow of existing run-off.





 